A place we call HOME

Finally got our keys on 8 Mar 2010. The condition of the house is original. Don't think can find this kind of condition elsewhere in the whole of Singapore.
Week 1 - While waiting for HDB to approve renovation activities, we replaced the carbon steel pipe to PVC pipe. $850 for all 3 pipe length.

Week 2 - Started to hack the old tiles. The squating toilet is fixed into a raised concrete block. Contractor insisted that block cannot hack. He suggest to top up the rest of the floor. We called HDB directly and confirm hacking is allowed. Sigh~~~ Cannot rely on contractor.
 Week 3 - Laying tiles everywhere.