Week 1 - While waiting for HDB to approve renovation activities, we replaced the carbon steel pipe to PVC pipe. $850 for all 3 pipe length.
Week 2 - Started to hack the old tiles. The squating toilet is fixed into a raised concrete block. Contractor insisted that block cannot hack. He suggest to top up the rest of the floor. We called HDB directly and confirm hacking is allowed. Sigh~~~ Cannot rely on contractor.
Week 3 - Laying tiles everywhere.