2 months after shifted into Clementi, our common room is still not quite done yet. Currently there is a small computer table. A 22" monitor & keyboard occupied 90% of the table. Not enough space to study. We also have 1 super-single bed, 1 bookshelf, 1 rack & 1 clothes hanger.
To make this room complete with more storage space, I need a wardrobe & a chest of drawer. But I afraid these 2 pieces of furniture will make this room smaller. Hopefully can get something suitable from JB again.
Showing posts with label New Home. Show all posts
Showing posts with label New Home. Show all posts
Tuesday, July 27, 2010
Friday, July 23, 2010
Friday, May 28, 2010
Sunday, May 9, 2010
Thursday, April 1, 2010
Wednesday, March 24, 2010
Wednesday, March 17, 2010
A place we call HOME
Finally got our keys on 8 Mar 2010. The condition of the house is original. Don't think can find this kind of condition elsewhere in the whole of Singapore.
Week 1 - While waiting for HDB to approve renovation activities, we replaced the carbon steel pipe to PVC pipe. $850 for all 3 pipe length.
Week 1 - While waiting for HDB to approve renovation activities, we replaced the carbon steel pipe to PVC pipe. $850 for all 3 pipe length.
Week 2 - Started to hack the old tiles. The squating toilet is fixed into a raised concrete block. Contractor insisted that block cannot hack. He suggest to top up the rest of the floor. We called HDB directly and confirm hacking is allowed. Sigh~~~ Cannot rely on contractor.
Week 3 - Laying tiles everywhere.